top of page

Panel Clearance Areas

It has been requested in the past that we consider adding clearance areas to our panels to assist with coordination and to help identify conflicts with other discipline items over the panels.


As shown below, the panels will now have a red transparent area above, below and in front of the panel. The top clearance area can be stretched up or down in a section view to the underside of the floor pan above or to whatever surface the user deems acceptable.


The 208v and 240v panels have the code required 3 feet clear in front while the 480v has 4 feet (in lieu of 3'-6"). The clearances are shown dashed in floor plans and can be toggled off in the properties box if need be; though it may be a good practice to keep them on in our contract documents.

24 views0 comments
bottom of page